BULLETIN 346A :   SiloPatrol® Inventory Monitoring System Application Questionnaire

Name:

Company:

Job Title:

Address:

Telephone:

 

Fax:

E-mail:

Industry of End User:

Material: (Trade and/or Scientific Name)
Physical Properties:
Temperature:
Moisture:

Bulk Density:

Min:

° C
° F

Min:

%

Particle Size:

Max:

° C
° F

Max:

%

Viscosity:

Normal:

° C
° F

Normal:

%

Slurry:

% of Solids

     

Nature:

Abrasive

Corrosive

Coats Wall/Probe

Vessel Construction:
  

Number of Silos:

Click Here to view illustration of silo dimension terminology

 

Material:

Liner Material:

Height Overall:

Internal Diameter/Width:

Discharge Opening DIA:

Height/Linear Section:
( STRAIGHT WALL ONLY)


Cone Height:

Roof Slope:
( 0° 5° 10° or other )

Vessel Type:
  

Cone Bottom

Horizontal

Flat Pitched Bottom

Dish Bottom

Rectangular

Other:

Internal Pressure:
Operator Interface:

Min:

psi

HMI2 Contol Console

Pulse Retro

 

Max:

psi

SiloTrack

Analog

 

Normal:

psi

 

   
Environment:
Indoors
Outdoors
Communication Option:
Any Approvals Required:
Indicate "No" or "Yes". If "Yes", please list required approvals

Wireless

Additional Comments:

 

Providing a sketch of your application is not required, but highly recommended.

Please e-mail a sketch to our application specialists - techsupport@monitortech.com
You can also fax your sketch to (630) 365-5646
(ATTN: Tech Support/ RE: Online Application Questionnaire)


HOME | PRODUCTS | CONTACT US | REP LOCATOR | INDUSTRY LINKS | SHOWCASE | ABOUT US
SITE MAP


© 2022 • Monitor Technologies, LLCAll Rights Reserved
Privacy / Cookies Policy & Terms
1.800.601.6319 or 1.630.365.9403


 
  Translate This Web Page:
Translate text and documents.